Stormwater & Soil Disturbance
Residential Subdivision Minor Subdivision (4 lots or less): Major Subdivision (5 lots or more): Non-Residential/Commercial | $475 flat fee $875 flat fee or $75/lot, whichever is greater |
Stormwater Pollution Prevention Plan (SWPPP) Acceptance Form/Notice of intent | $275 |
Stormwater Notice of Termination | $275 |
Attachment | Size |
---|---|
Draft 2023 MS4 Annual Report | 323.24 KB |
Draft 2022 MS4 Annual Report | 314.99 KB |
Draft 2021 MS4 Annual Report | 386.05 KB |
Draft 2020 MS4 Annual Report | 13.56 MB |
Stormwater Application | 275.91 KB |
Stormwater Information Sheet | 214.08 KB |
After the Storm | 422.02 KB |
IDDE Fact Sheet | 275.38 KB |
Make Your Home the Solution to Stormwater Pollution | 676.44 KB |
Pet Waste Handout | 94.52 KB |
Pollution Prevention_Good Housekeeping Fact Sheet | 216.79 KB |
Post-Construction Runoff Control Fact Sheet | 256.1 KB |
Protecting Water Quality from Urban Runoff | 231.28 KB |
Public Education and Outreach Fact Sheet | 232.14 KB |
Public Involvement and Participation Fact Sheet | 227.41 KB |
Water Efficient Landscaping | 1.64 MB |
What Can You Do To Protect Local Waterways | 468.75 KB |